IDEAS. SYSTEMS. POSSIBILITIES.
Insights3 min read

How to Test File Uploads Before Your Supplier Portal Goes Live

Four acceptance tests for supplier portals: prove that a file reaches the right order, errors are clear, and a retry does not leave duplicate attachments.

Illustration of a document moving from a phone-sized tray into a receiving slot.
File handoff from phone to portal. Original AI-generated concept illustration.

In brief

Test the entire upload journey with representative files and a real phone. A useful test shows what the supplier sees, what record receives the file, and how the team recovers when something goes wrong.

Define what “uploaded” means

Imagine a supplier attaching a 12 MiB delivery-note PDF to a purchase order from a phone. The progress bar reaches 100%, but the purchasing team cannot find the file. The transfer may have finished without the attachment being linked to the order.

Agree on three separate outcomes: the portal received the file, it attached the file to the intended order, and the document passed any checks your business requires. If review happens later, tell the supplier that it is pending rather than saying the document was accepted.

    Set a limit from real work

    Ask suppliers or operations staff what they actually send: formats, typical sizes, the largest legitimate files and whether phone scans are common. Use synthetic files of comparable size for testing. State the accepted formats and maximum size before the upload starts.

    Check the route the file actually takes. An intermediary may limit the full request, which can be larger than the file itself. Vercel’s November 20 announcement, for instance, describes a larger inbound request limit available in public beta on eligible configurations. That does not set your portal’s file limit or prove an upload will work.

      Run four acceptance tests

      Start with two test orders and an authorised supplier test account. For each run, check the supplier-facing message and the purchasing team’s view. Confirm that the file opens from the intended order, is absent from the other one and has the expected review status.

      • A routine PDF attaches once and can be opened from the correct order.
      • A representative large PDF, such as the fictional 12 MiB example, works if it is within the agreed limit.
      • An over-limit file is rejected clearly, with no broken attachment or misleading success message.
      • An interrupted mobile upload can be retried; if the first attempt had already saved, the same retry does not create a second attachment.

      Give both people a next step

      If a file is too large, name the affected file, state the limit and explain what to do next. If a valid file is waiting for review, show its purchase-order reference so the supplier and purchasing team can discuss the same submission.

      You can often make this test part of user acceptance before launch: one supplier-side tester, one operations reviewer, and agreed evidence for each outcome. If the intended test cannot be explained in a sentence, settle that workflow with the team before adding more upload options.

        Further reading

        CONNECT THE IDEA TO YOUR BUSINESS

        Custom Software Development

        A GOOD PLACE TO START

        An idea worth talking about?

        Tell us what you want to build, connect
        or make easier to run.